Compare
Compare tr_fixed_post
Review 2 variants across tiers, MOQ, and differentiators.
Top recommendation
TR Fixed Post 1.2m (001TR140000-EG)
Best ValueBulk Ready
Variants
2
Origins
1
POA Lines
0
Logistics
1
Recommendation
Which one should you buy?
Priority order: availability, compliance, value, and bulk readiness. Bulk quantities can elevate bulk-ready items.
Recommended pick at qty=1: TR Fixed Post 1.2m (001TR140000-EG).
Best ValueBulk Ready
Hero variants
Recommended picks at a glance
Best ValueBulk Ready
Safety | Edge Protection (TS EN 13374)
TR Fixed Post 1.2m
001TR140000-EG
Best ValueBulk Ready
Safety | Edge Protection (TS EN 13374)
TR Fixed Post 1.2m
001TR140000-HDG
Comparison table
Tier pricing and MOQ
| SKU | Name | Brand | Packaging | Origin | Logistics | Contractor Price | Contractor MOQ | Distributor Price | Distributor MOQ | POA | Market Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 001TR140000-EG | TR Fixed Post 1.2m | SAFETY SYSTEMS (EDGE PROTECTION | 1200mm (H); lower flange Ø145mm; pipe Ø42mm. | — | — | EUR 9.71 | On request | EUR 9.14 | On request | — | — |
| 001TR140000-HDG | TR Fixed Post 1.2m | SAFETY SYSTEMS (EDGE PROTECTION | 1200mm (H); lower flange Ø145mm; pipe Ø42mm. | — | — | EUR 11.58 | On request | EUR 10.90 | On request | — | — |
Related
More to explore
FAQ
Tiering, MOQ, and lead time
What are typical MOQs for tr_fixed_post comparison?
Contractor MOQ range: on request. Distributor MOQ range: on request. Items without numeric MOQ are marked on request.
How does tier pricing work for tr_fixed_post comparison?
Contractor pricing applies by default. Distributor pricing unlocks at the distributor MOQ for the SKU.
Are all tr_fixed_post items priced?
Pricing coverage varies. Some items may be POA and require confirmation.
What lead times should I expect?
Lead times depend on logistics class and origin. Common logistics classes here include standard freight. Confirm timing during quote.
Which logistics classes are used?
This comparison includes items across logistics classes such as standard freight. Plan container loads by grouping compatible classes.