Category

Chemicals

Browse 3 Chemicals items with specs, packaging, and lead-time guidance.

SKUs 3
Origins 1
POA Lines 1
Logistics 1

Use the manifest to validate MOQ unlocks and shipping class compatibility.

Overview

Category guide

This category guide covers 3 SKUs for Chemicals, built for procurement teams comparing specs, packaging, and lead times. Supply lanes include Turkey. Common logistics classes include standard freight. Contractor pricing is available on 2 items, with distributor pricing on 2. 1 items are price on request.

Typical contractor MOQs range from 1 to 64 where numeric. Distributor MOQs range from 10 to 1104 where numeric. Top picks in this category set include FOX-FS540-BITUM, FOX-EP-MORTAR, FOX-FX111-C2TE. Use the manifest to confirm availability, lead times, and compliance documentation before release.

If a SKU lists POA, request a quote to confirm pricing and lead times. Group items by logistics class to reduce split shipments. All pricing shown is ex-VAT unless otherwise noted. Compliance documents (SDS, DoP, test reports) are available per SKU where published.

Hero products

Top recommended picks

ZNR Bitumen Waterproofing (30L)
Exclusive SystemBulk Ready
Chemicals

ZNR Bitumen Waterproofing (30L)

FOX-FS540-BITUM
ZNR Epoxy Repair Mortar (3-Part)
Exclusive SystemBulk Ready
Chemicals

ZNR Epoxy Repair Mortar (3-Part)

FOX-EP-MORTAR
ZNR/Fox C2TE Tile Glue (25kg)
Exclusive SystemBulk Ready
Chemicals

ZNR/Fox C2TE Tile Glue (25kg)

FOX-FX111-C2TE
Product list

All Chemicals items

ZNR Epoxy Repair Mortar (3-Part)
Chemicals

ZNR Epoxy Repair Mortar (3-Part)

FOX-EP-MORTAR
ZNR Bitumen Waterproofing (30L)
Chemicals

ZNR Bitumen Waterproofing (30L)

FOX-FS540-BITUM
ZNR/Fox C2TE Tile Glue (25kg)
Chemicals

ZNR/Fox C2TE Tile Glue (25kg)

FOX-FX111-C2TE
Related

More to explore

FAQ

Pricing, MOQ, and logistics

What are typical MOQs for Chemicals category?
Contractor MOQ range: 1–64. Distributor MOQ range: 10–1104. Items without numeric MOQ are marked on request.
How does tier pricing work for Chemicals category?
Contractor pricing applies by default. Distributor pricing unlocks at the distributor MOQ for the SKU.
Are all Chemicals items priced?
Pricing coverage varies. 1 items are POA and require confirmation.
What lead times should I expect?
Lead times depend on logistics class and origin. Common logistics classes here include standard freight. Confirm timing during quote.
Which logistics classes are used?
This category includes items across logistics classes such as standard freight. Plan container loads by grouping compatible classes.